TMN, Issue 2, 2013: Project Management using Dynamic Scheduling: Baseline Scheduling, Risk Analysis & Project Control
Submitted by Mario Vanhoucke on Wed, 05/15/2013 - 07:02
In this article, published in 2013 in The Measurable News, a summary of the handbook ”Project Management using Dynamic Scheduling: Baseline Scheduling, Risk Analysis and Project Control”) is given. The book contains topics on how to construct project schedules (See ”Dynamic scheduling: An introduction to baseline scheduling”) and how they can be used in analyzing the risk of the schedules (see “Dynamic scheduling: An introduction to risk management”) and in controlling these project schedules once the projects are in progress (see ”Dynamic scheduling: An introduction to project control“). The book is used in various universities and company trainings as supportive material in class teaching sessions.
?Figure 1. The Measurable News, 2013, Issue 2 (click on this picture to download)
© OR-AS. PM Knowledge Center is made by OR-AS bvba | Contact us at info@or-as.be | Visit us at www.or-as.be | Follow us at @ORASTalks